Macro Management of Agriculture Scheme - Supplementation/Complementation of States efforts through Work Plan (Macro Management)

 

 

Type

Centrally Sponsored Scheme

 

 

Objective

Macro Management Scheme will aim at all round development in agriculture through Work Plans prepared by States.  These include :

 

Salient Features

It has been decided to move away from schematic approach to Macro Management mode by integrating 27 Centrally Sponsored Schemes listed at Annexure I.  The previous pattern of rigid uniformly structured Centrally Sponsored Schemes, permitting little or no flexibility, which resulted in large unutilized balances with States has been dispensed with.  Integration of Centrally Sponsored Schemes under Macro Management approach will enhance the productivity of support programmes and accord greater flexibility to State Governments to develop and pursuer activities on the basis of regional priorities.  It is, thus, a major step towards achieving decentralization in pursuance of restoring primacy of States in agricultural development planning.  The Central Government will supplement/complement the State Governments’ efforts through regionally differentiated Work Plans comprising crop/area/target group specific interventions, formulated in an interactive mode and implemented in spirit of partnership with the States.

 

 

Pattern of assistance

The outlay of the Work Plan would be shared by the Centre and the States in the ratio of 90:10.  In the case of North Eastern States, however, the entire expenditure will be borne by the Government of India.  Central assistance for Work Plans will be in the ratio of 80% by Grants and 20% by Loans.

 

 

Eligibility

All States/UTs

 

 

Person to be contacted

Ms. Anjali Prasad,

Joint Secretary,

Macro Management,

Department of Agriculture & Cooperation

Krishi Bhawan, New Delhi

 

 

Date of Start

November 2000

 

 

Guidelines

The Government has approved separate guidelines for implementation of the Scheme.  According to these guidelines the 50% of the allocation is to be released as First Instalment to the States/UTs.  The release of Second and final instalment is governed by the prescribed conditions.  A copy of the guidelines is at Annexure II, III & IV.

 

Implementation Status

The position regarding Budget Estimates, Revised Estimates and expenditure incurred under the scheme for the years 2000-2001 2001-2002, 2002-2003 & 2003-04 is as indicated below:         

 

                                    (Rs. in Crores)

Year

Budget Estimate

Revised Estimate

Expenditure

2000-01

490.00

381.88

381.88

2001-02

850.00

680.49

678.62

2002-03

736.86

597.00

597.59

2003-04

700.00

648.60

648.49

 

During the current financial year viz. 2004-05 a sum of Rs. 719.94 Crores has been provided in the Budget for implementation of the scheme.  Out of 719.94 Crores, a sum of Rs. 695.00 Crores has been earmarked for release to the States/UTs.  The State/UT wise allocation for 2004-05 is enclosed.  Work Plans for 2004-05 in respect of most of the states have been discussed/finalized and the 1st instt. amounting to Rs. 328.74 Crores has been released (details enclosed- Annexure V)  to the States/UTs

 

 

Subsidy

Subsidy is available under the Scheme on various components including agriculture implements such as Tractor, Power Tiller, Power Thrashers, Sprinklers and Plant Protection Equipments.  Subsidy is also available on certified quality seeds and IPM demonstrations.  Subsidy per farmer or per activity should not exceed 25% of the cost or the present subsidy level approved under 27 identified schemes, whichever is lower.

 

 

Physical Monitoring

Monitoring of the relevant component of the Macro Management Scheme is the responsibility of the concerned Subject Matter Division.  The Subject Matter Divisions concerned have been requested to obtain and consolidate the information in the prescribed proforma (Annexure-VI).  States are required to furnish the Utilization Certificate in the prescribed proforma (GFR-19A) (Annexure-VII).

 


 

 

 Annexure - I 

 

LIST OF CENTRALLY SPONSORED SCHEMES

 

 

1.   Assistance to Coop. Weaker Section
2.   Assistance to Women Cooperatives
3.   Non-overdue Cover Scheme
4.    Agri. Credit Stabilisation Fund
5.   Special Scheme for SC/ST
6.   Integrated Cereal Development Programmes in Rice Based Cropping System Areas
7.   Integrated Cereal Development Programmes in Wheat Based Cropping System Areas
8.  

Integrated Cereal Development Programmes in Coarse Cereals Based Cropping System Areas

9.   Special Jute Development Programme
10.   Sustainable Development of Sugarcane Based Cropping System
11.   Balanced & Integrated Use of Fertilizer
12.   Promotion of Agricultural Mechanization among Small Farmers
13.   Integrated Development of Tropical, Arid & Temperate Zone Fruits
14.   Production and Supply of Vegetable Seeds
15.   Development of Commercial Floriculture
16.   Development of Medicinal and Aromatic Plants
17.   Development of Roots and Tuber Crops
18.   Development of Cocoa and Cashew
19.   Integrated Programme for Development of Spices
20.   Development of Mushroom
21.   Use of Plastics in Agriculture
22.   Bee-Keeping
23.   National Watershed Development Project for Rainfed Areas
24.   Scheme for Foundation & Certified Seed Production of Vegetable Crops
25.   Soil Conservation in Catchments of River Valley Projects & Flood Prone Rivers
26.   Reclamation & Development of Alkali Soils
27.   State Land Use Board


 

Annexure-II

 

 

DECISIONS OF GOVERNMENT ON THE SCHEME – MACRO MANAGEMENT OF AGRICULTURE

 

  1. The work plan would indicate the physical targets and the benefit stream in terms of area, production level, productivity etc.
     

  2. The outlay of the Work Plan would be shared by the Centre and the States in the ratio of 90: 10 respectively.   In the case of North-Eastern States, however, the entire expenditure will be borne by Government of India.
     

  3. The Central assistance to the States for the Work Plan will be in the ration of 80% Grant and 20% Loan.
      

  4. New initiative by State Government will be governed will be governed by the following criteria :-
     

     

    -   It would not be covered under any other approved Scheme of Central Government.

               

    -     It would not be part of the any on-on-going State Scheme.

     

    -     Expenditure on new initiative would not be more than 10 % of the allocation to a State under the Scheme of Macro Management.
      

  5. There should be cap on subsidy to farmers incorporated in the  Work Plans. Subsidy per farmer or per activity should not exceed 25 % of the cost or the present subsidy level approved under 27 identified schemes, which ever is lower. However, considering the difficulty in operationalising this decision in the middle of the Plan period, it may be brought into effect from the 10th Plan
     

  6. While the Union Department of Agriculture & Cooperation would have flexibility for reallocation, expenditure under the individual component would not be in excess of 20% of what has been incurred in the last year.
     

  7. Creation of posts and purchase of new staff vehicles should not be included in the Work Plans.

 

 

 

Annexure – III

 

GUIDELINES FOR THE IMPLEMENTATION OF MACRO MANAGEMENT SCHEME

 

  1. The permissible carry over of unspent balance in the first year of operation would be 25% of the annual allocation.  This permissible carry over would be reduced by 5% every year so that the permissible carry over is brought down to 10% of annual allocation over a period of 4 years.
      

  2. 50% of the annual allocation would be released as first installment of a financial year.
      

  3. The release of second and final installment would be considered on the fulfillment of the following conditions. 
     

    (i)      Utilization Certificate for the funds released up to the previous financial year.

     

    (ii)    Expenditure of at least 60% of available funds i.e. unspent balance of the previous year plus the releases in the first installment.

     

    (iii)    Full release of the corresponding share of the State Government.
     

  4. The second release would be made during the period from October to March.  The request for second installment may be made by the implementing agencies (States/UTs) by October.  Releases would be made on graded basis depending on the time of reporting utlization as also the receipt of complete proposal for second installment.  The graded release would be on principles as indicated below :- 
     

    Proposals received in  : 

     

    October to December   -            50% of allocated funds

     

    January                         -            40% of allocated funds

     

    February                       -            30% of allocated funds

     

    March                           -            20% of allocated funds


     

  5.  Any excess over the permissible limit of 25% carry over will be adjusted in the 2nd installment.

        

 

 

 

Annexure-IV

 

 GUIDELINES FOR THE STATES MACRO MANAGEMENT OF AGRICULTURE

 

Macro Management Mode is a major step towards achieving decentralization in pursuance of restoring primacy of the States in agricultural development planning.  Under the Scheme for Macro Management of Agriculture, the States have the freedom to develop and pursue activities on the basis of their regional priorities through the Work Plans.

 

Work Plans

 

New Interventions

 

Subsidy

 

Release of Central assistance

 

 

Utilization of Central assistance

 

 

Special Component Plan (SCP) and tribal sub Plan (TSP)

           

Monitoring of the progress of the Scheme

 

 

Formulation of proposals for the Xth Five Year Plan

 


 

 Annexure-V

 

Macro Management of Agriculture

 

Allocation for 2004-05 and release of 1st instt.

 

                                                                                                       (Rs. in crores)

S.No.

States/UTs

Allocation

(Central share)

Amount of Central assistance released

1.

ANDHRA PRADESH

36.00

18.00

2.

ARUNACHAL PRADESH

5.00

2.50

3.

ASSAM

8.00

4.00

4.

BIHAR

18.00

7.20

5.

CHHATTISGARH

18.00

9.00

6.

GOA

2.00

1.00

7.

GUJARAT

23.00

11.50

8.

HARYANA

16.00

8.00

9.

HIMACHAL PRADESH

16.00

8.00

10.

JAMMU & KASHMIR

16.00

8.00

11.

JHARKHAND

14.00

7.00

12.

KARNATAKA

57.00

28.50

13.

KERALA

29.00

14.50

14.

MADHYA PRADESH

45.00

22.50

15.

MAHARASHTRA

82.00

41.00

16.

MANIPUR

7.00

3.50

17.

MIZORAM

9.00

4.50

18.

MEGHALAYA

7.00

3.50

19.

NAGALAND

9.00

4.50

20.

ORISSA

23.00

11.50

21.

PUNJAB

15.00

 

22.

RAJASTHAN

68.00

31.25

23.

SIKKIM

6.00

3.00

24.

TAMIL NADU

43.00

20.05

25.

TRIPURA

8.00

4.00

26.

UTTAR PRADESH

70.00

32.05

27.

UTTARANCHAL

16.00

7.19

28.

WEST BENGAL

24.00

12.00

29.

DELHI

1.00

 

30.

PONDICHERRY

1.00

0.50

31.

A&N ISLANDS

1.00

0.50

32.

CHANDIGARH

0.25

 

33.

DADRA & NAGAR HAVELI

0.50

 

34.

DAMAN & DIU

0.25

 

35.

LAKSHADWEEP

1.00

 

 

TOTAL

695.00

328.74

 

 

 

 

Annexure -VI

WORK PLAN PERFORMANCE PROFORMA

                          PHYSICAL AND FINANCIAL TARGETS AND ACHIEVEMENTS

 

 

                                                             (Rs. In lakhs)

S.No. Name of Scheme Components of the Scheme Unit Target Achievements
Phy. Fin. Phy. Fin.
1. Strengthening of training institutes

Expansion of existing building, training hall, hostel and purchase of instruments etc. of

 

1.   Apex institute

2.  Satellite institutes

Training courses

    
Training courses

       
2. Training support for Agri. Extension Activities

1. Human Resource Development  Programme

 

(a)   trainings.

Total

 
  

Nos.

       
3. Mobility of extension machinery Vehicle repairs, P.O.L., supply of materials & hiring of vehicles. Nos.        
4. Study tours/farmers exchange programme Organisation of study tours
   1.  Within State

    Total

Group of 50 farmers
       
5. Extension through Agrl.  Exhibition 1.  Organisation of exhibition
     & production of exhibites
      etc.
  1. National level
  2. State level
  3. District level
  4. Important Festivals

2.  Preparation of exhibits at
     State level
3.  Publications and training
     material

 Total

Amount per unit        
6.
  1. Strengthening of soil survey & Soil Testing Laboratories
1. No. of samples to be tested No.        
  1. Working capital for I.P.M. Labs
2. Bioagents
  1. Trichogramma
  2. Trichoderma
  3. N.P.V.
  4. Chrysoperla

  Total

 

 

Cards

M.T.

Lit.

Egg. Units

       
7. Establishment & strengthening of agro polyclinics
  1. Training Infrastructure
  2. Training material including
    implements and equipments
  3. Infrastructure Development including Dormetory.

As per

Requirement & project cost of

infrastructure

       
8. Strengthening of seed farms
  1. Irrigation facilities and
    minor works
  2. Mechanization
  3. Other (Repairs, maintenance, supplies etc.)
No.
 
No.
No.
9. Development of cereal crops
  1. Block demonstration
  2. Farmers training
  3. Field visit
  4. Distribution of improved agriculture implements
  5. Common facility centers

 

Total:

9b. Development of sugarcane 1.  Field demonstration
2.  Seed multiplication
 

a.            Breeders seed

b.            Foundation seed

c.            Certified seed

3.  Human resource
    development programme

a.    Farmers training

b.    Field visit

4.  Land Development
     Programme

a.   Green manuring

b.   Insitu trash manuring

5.  Agriculture implements
    
a.    Bulluck drawn

6.  Contingency

Total:

10. Development of sugarcane in low productivity areas 1.  Field demonstration
2.  Seed multiplication

a.   Breeder seed

b.   Foundation seed

c.    Certified seed

3.  Human resource
     development programme

a.   Staff training

b.   Farmers training

c.    Field Visit

4.  Land Development
     Programme

a.   Green manuring

b.   Insitu trash manuring

c.   Gypsum supply

5.  Agriculture implements
    
    
a.   Bulluck drawn

6.  Contingency

   Total:

11. Use of information technology in agriculture
  1. Software development, C.D. development, Web application, training connectivity
  2. Digitization of soil survey maps
  3. Maintenance, repairs of hardwares and stationery
  4. Updation of existing old hardwares

Total:

No.
12. INPUT
Assistance for breeder seed purchase, foundation seed production & certified seed distribution & storage for cereal crops
   
  1. Breeder seed purchase
  2. Foundation seed production
  3. Certified seed distribution
  4. Seed buffer stock

Total


Qtls
13. Seed production programme in selected villages Seed production programme of improved seeds of varieties of paddy, wheat & minor millets.
14. Hybrid and basmati rice development programme
  1. Hybrid rice production & distribution
  2. Basmati rice distribution

Total

15. Opening of fertilizer distribution centers in Hilly, Remote and inaccessible areas

Opening of fertilizer distribution centers in Hilly, Remote and inaccessible areas

16.

Setting up of germ compost production programme units

Setting up of vermin compost production units
17. Production of bio pesticides To promote efforts of production of bio-pesticides in the State
18. Agriculture mechanization
  1. Distribution of tractor on subsidy
  2. Distribution of tractor drawn & self propelled implements under subsidy
19. Participation of private sectors in extension/information/soil testing/micro nutrient testing
  1. Agriculture information center
  2. Market information center
  3. Agriculture service center such as soil testing lab. 
No.
20. National watershed development Programme Management Component
  1. Administration cost
  2. Community organizations (7.5%)
  3. Training programme (1%)

Development component
a.   Arable land * Natural
      Resource Management
      (64%)

  1. Soil and moisture conservation activities
    1. Earthern structure

    2. Loose bolder structure

    3. Countour vegetatives veges

     

  2. Agronomic conservations practices (Countour cultivation)
  3. Others

b.  Non arable lands

  1. Contour vegetative hedges

Run off managements structures

  1. Small dugout sunkan ponds

Water Harvesting structures

  1. Earthern structures

Conservation and development of bio-mass

  1. Vermi-compost

Others

  1. Compost pits

c.  Drainage Lines

Upper reaches

  1. Loose bolder structure

  2. Eathern structure

  3. Small dugout sanken ponds

No.
21. River Valley project
  1. Work
  2. Contingency
  3. S.M.S.
  4. Construction
  5. Training
  6. Corpus

Total

Ha./No
Rs.
Rs.
Rs.
Rs.
Rs.
22. Strengthening of state land use board

Seminars

 

Conferences

 

Publication material

23. MICRO IRRIGATION
Spread of drip/sprinkler irrigation & green house technology
  1. Drip irrigation set installation
  2. Sprinkler irrigation set installation
  3. Green house
  4. Mulching
  5. Sheding net
  6. Sheding net house
  7. Establishment of drip/sprinkler testing lab.
  8. Training & contingencies.

Total

Ha

No

Ha
No.
No.
No.
24. HORTICULTURE
Development of cashew
  1. Plant protection
    a.   P.P. Appliances
    b.   P.P. Chemicals, I.P.M.
  2. Assistance for cashew processing units
  3. Rejuvenation
  4. H.R.D.
  5. Publicity, Contingency, Infrastructure

Total


No.
Ha
No.

Ha
No
25. Development of fruits
  1. Farmer educational tour (H.R.D.)
  2. Use of micro nutrients & P.G.R.
  3. Rejuvenation of old orchads
  4. Conversion of country mango & ber
  5. Tissue/leaf analysis lab
  6. Public sector
  7. Disease forecasting center
  8. Horticulture Machanisation
  9. Plant Protection
  10. On farm handling units
  11. Technology development
  12. Hi-tech/export quality demonstration
  13. Fruit juice vending machine
  14. Publicity, contingency and infrastructure

Total

No.

Ha.

No.
No.

No.
No.
No.
Ha.
No.
No.
No.
Ha.

No.
26. Development of floriculture
  1. establishment of floriculture centers
  2. Strengthening of existing model horticulture centers
  3. Area expansion
  4. Visit to Hi-tech center
  5. Incentives for handling uint
  6. Organisation of flower shows
  7. Value addition to the flowers & floriculture products
  8. Human resource development
  9. Publicity, media, support infrastructure and contingency.

Total

No.

No.

No.
No.
No.
No.
No.

No.
27. Development of Mushroom
  1. HRD for farmers
  2. Assistance for Mushroom production

Total

No.
No.
28. Development of Spices
  1. Distribution of black paper cutting
  2. Demonstration of Betel vine
  3. Plant Protection/IPM
  4. Breeder Seed Production
    a.  Turmeric
    b.  Ginger
  5. Processing
    a. 
    Polishing drum for turmeric
    b.  Grinding machine for
         spices
  6. H.R.D. for farmers/staff
  7. Publicity, contingency & infrastructure

Total

No.

Ha.

Ha.

M.T.
 
 
M.T.

  
  
 

No.

No.

29. Development of Medicinal & Aromatic Plants
  1. Demonstration cum seed production
  2. Area expansion
  3. assistance to distillation unit
  4. Traisfer of technology
    a.   Farmers tour
    b.   Seminar
  5. H.R.D. for officers and staff
  6. Publicity and contingency

Total

No.

   

No.

No. 

No.
 
   

No.

No.

30. Development of tea & coffee Area expansion No.
31. Development of vegetable
  1. Certified and foundation seed production
  2. Plant Protection/ I.P.M.
  3. H.R.D. (Farmer & Staff)
  4. Establishment of backyard nutritional garden in tribal area
  5. Assistance for residue testing
  6. Demonstration on organically grown as well as exportable vegetables
  7. Demonstration of root & tuber
  8. Demonstration of cucurbits
  9. Onion storage structures
  10. Publicity, media support, seminar, vegetable shows, workshops, infrastructure and contingencies etc.

Total

Qtl.
   
Ha.
No.
No.
  
  
No.
  
No.
  
   
No.
   
No.
  
No.
No.
32. Development of nurseries
  1. Germplasm and nursery area development
  2. Increase water potential
  3. Increase improved/highly technical facilities
  4. Mechanization
  5. Resource development
  6. Material supply

Total

No.  

  

No.

No.

  

No.

No.

No.

33. Agriculture Marketing
34. Assistance preparation of feasibility project report Assistance for preparation of feasibility project report No.
35. Assistance for establishment of common facilities center for value addition to fruit and vegetable crops Assistance for establishment of common facilities center for value addition to fruit and vegetable crops No.
36. Incentives on experimental consignment for export Incentives on experimental consignment for export No.
37. Assistance for participation in exhibition by entrepreneur officers Assistance for participation in international exhibition by entrepreneur officers No.
38. Assistance for establishment of marketing information center Assistance for establishment of marketing information center No.
39. Assistance for opening of the retail outlet (market support for fruits and vegetables) Assistance for opening of the retail outlet (market support for fruits and vegetables) No.
40. Assistance for establishment of residue testing lab. Assistance for establishment of residue testing lab. no. of samples
41. Assistance for establishment of food park Assistance for establishment of food park No.
42. Assistance for establishment of basmati rice

Interventions in view of W.T.O. regime

Assistance for establishment of basmati rice
  
  1. Awareness Campaign
  2. Impact, evaluation studies, Market Surveys and Research
  3. Consultancy Services & Purchase of Technology
  4. Support to SAUs for patenting & preparation of documentary evidences
  5. Support of WTO Cell

Total

No.
  

   
No.
No.
  
   
No.
  
No.
  
    
   
No.

    

 

 

 

 

Annexure - VII

FORM GFR 19-A

 

(See Government of India’s Decision (1) below Rule 150)

Form of Utilization Certificate

 

S.No. Letter No. & Date Amount

Certified that out of Rs. ……………….of Grants-in-aid sanctioned during the year ……………in favour of ………… … ………….. under this Ministry/Department Letter No. given in the margin and Rs……………. on account of unspent balance of the previous year, a sum of Rs. ………….has been utilized for the purpose of …………………….for which it was sanctioned and that the balance of Rs……………remaining unutilized at the end of the year has been surrendered to Government (vide No…………dated ……………..)/will be adjusted towards the grants-in-aid payable during the next year……………

 

 

  1. Certified that I have satisfied myself that the conditions on which the grants-in-aid was sanctioned have been duly fulfilled/are being fulfilled and that I have exercised the following checks to see that the money was actually utilized for the purpose for which it was sanctioned.

 

 

Kinds of checks exercised

            1.

            2.

            3.

            4.

            5.

Signature......................................................

Designation..................................................

Date..............................................................

 

[G.I., M.F., O.M. No. F. 14 (1)-E-II (A)/73, dated the 23rd April, 1975 ]

 

[About Us]  [Programmes & Schemes]  [Farm Produce Prices]  [Statistics]  [Weather]  [Documents]
[
Stop Press]  [Announcements]  [Feedback]   [Help Desk]